Dear All

 

  1. Here is the Link for the M18 draft of the technical reporting (excl reporting on use of financial resources)

https://docs.google.com/document/d/1_JI9DUQLzIBnobgKO77Xiy_22fOejLGU/edit?usp=sharing&ouid=106869227590395111863&rtpof=true&sd=true

  1. You can double check your slides for the rehearsal against this.
  2. A quality control has been made for consistency in language, acronyms, and where possible presentation of information across WPs etc. (Note: Year and Cycle are written out in full. Exten(.D.T)2 is used when referring to the project (as in the proposal) and ExtenDT2 for the platform. There should be no links in the body of the text - these should instead be shown as footnotes). It will be further tidied up before sending to the reviewers.

 

To Do:

@Thea: there are short sections on Impact, D&E and Open Science which require your review/further input. Apologies for the late notice on this.

 

@All WP leaders: It would be good if you read the whole report, in addition to your WP, and check  so there are no inconsistencies with what you may have reported in your WP.

IMPORTANT: the reviewers will be checking what you have reported for the first 18 months against what was written in the Grant Agreement so it is your responsbility to check that this is adeaquately covered in your reporting.

 

The reviewers require a draft early next week so the Deadline is 15.00 CET this Monday 8 April.

 

(NB: Re, Financial Reporting on deviations – LNU will come back to you on this. I will check with our PO the level of detail the reviewers require for this and if it is pdssible we can provide this later than the technical part of the report.)

 

Thank you for your cooperation.

 

Best regards

Shamim